Quick Summary

A kitchen renovation in the UK typically costs from low thousands for a refit within the existing layout to £30,000 or more for a bespoke or structural project. Timelines run from one to two weeks on site for a simple refit to four to eight weeks or more for bespoke work, and lead times for units and worktops often drive the schedule.

  • Labour and remedial work often rival the visible material cost in older properties.
  • Scope is the most useful way to compare quotes, since two renovations can differ greatly.
  • Lead times for bespoke cabinets and stone worktops are the biggest source of delay.
  • Freeze the appliance list and layout before services start to avoid re-routing costs.
  • Hold a contingency allowance, especially for older properties where hidden problems often appear.

Table of Contents

Kitchen renovations in the UK vary widely in cost and duration, depending on the scope of the work, the finish chosen and the condition of the property. This guide from A B Carpentry & Renovations sets out how the kitchen renovation timeline and cost guide fits together so you can plan with fewer surprises. Pricing and programme length depend on your property, your chosen finish and the trades involved, so contact us for a site survey and a written quote.

How Much Does a Kitchen Renovation Cost in the UK?

A kitchen renovation’s cost is set less by the cabinets than by what sits behind them. Units and worktops are the visible line items, but the labour to remove the old kitchen, make good the walls and floors, and reconnect services usually accounts for a large share of the total.

Kitchen fitting services, including the labour to install customer-supplied units, are priced separately from materials. That split matters if you have already bought your cabinets, because the installation quote should state exactly what it covers.

What Drives the Total Cost

Several factors move the final figure more than the choice of brand:

Budget, Mid-Range and High-End Scopes Compared

Scope is the most useful way to compare quotes, because two “kitchen renovations” can cover very different work. The table below groups typical scopes by what they include, the programme you should expect, and the line that most often drives the final bill.

Scope What It Usually Includes Typical Programme Indicative Cost Band Main Cost Driver
Refit within existing layout New units, worktops, sink, basic electrics 1-2 weeks on site Low thousands in labour, plus unit and worktop supply Supply of units and worktops
Mid-range renovation Refit plus flooring, lighting, some plastering 2-4 weeks on site Mid-teens of thousands all-in Making good and finishing
Bespoke or structural Layout change, remedial carpentry, bespoke joinery 4-8+ weeks on site £30,000+ and upwards Structural work and custom joinery

Ask each supplier to price the same scope so you can compare like with like. A quote that bundles installation, materials and making good is easier to compare than one that separates them, provided the exclusions are written down.

Where the Money Actually Goes

It helps to see the budget as four buckets rather than one number. Materials covers units, worktops, appliances, sinks, taps and tiles. Labour covers stripping out, carpentry, plumbing, electrical and gas work, plastering, tiling and decorating. Remedial and structural work covers whatever the survey uncovers once the old kitchen is out. Contingency is the buffer you hold back for the unexpected. Most practitioners find that labour and remedial work together often rival or exceed the visible material cost in older properties, which is why a quote built only on cabinet prices misleads.

Watch out: a low headline quote frequently excludes making good, decorating, appliance connection and waste removal. Ask for those items to be priced explicitly so the comparison is honest.

How Long Does a Kitchen Renovation Take, Phase by Phase?

The overall duration of a kitchen renovation depends on the scope of the work, and much of the time can be spent waiting for decisions and deliveries. Survey, design sign-off, ordering and delivery often take longer than the physical fitting itself.

The table below sets out a typical programme for a mid-range renovation. Timings are indicative and assume a straightforward property; a structural or bespoke project stretches each on-site phase, and an older property adds remedial time that is hard to predict until strip-out.

Phase Typical Duration Decision Deadline Cost Impact if Late
Survey and measure 1-2 weeks from first contact Before design begins Re-survey fees; design rework
Design and specification sign-off 2-4 weeks Before any order is placed Late orders push the whole programme
Quote and order long-lead items 1-2 weeks to order; lead time then applies Order day is the critical date Cabinet or worktop delay stalls fitting
Strip-out and remedial work 2-5 days None, follows order confirmation Hidden damage adds days and cost
Services (plumbing, electrical, gas) 2-4 days Before first fix is covered up Inspection delays stop the programme
Installation (units, worktops, appliances) 1-2 weeks Worktop template after cabinets Late template delays sink and tap
Finishing and snagging 3-5 days Before handover Rework and revisits
Handover 1 day None Retention or final payment dispute

Lead Times and Critical-Path Dependencies

Lead times are the single biggest source of delay. Bespoke cabinets, stone worktops and some integrated appliances can take several weeks to arrive after order, and fitting cannot finish until they do.

The critical path runs from design sign-off through cabinet order, delivery, installation and worktop template to final connection. Anything that sits on that path, a changed appliance model, a delayed worktop material choice, a late decision on sink position, moves the completion date.

Decision Deadlines That Protect the Programme

Most schedule slippage traces back to a decision made too late rather than a trade working too slowly. The decisions that matter most, and when they must be made, are:

Watch out: a change to the appliance list after first fix can mean re-routing power or water, which adds both cost and days to the programme. Freeze the specification before services start.

How Scope Changes the Timeline

The overall project, from first survey to handover, is longer than the on-site figure in every case, and the gap between the two is where most disappointment arises.

Your installer should give you a dated programme once the scope is fixed, with the order date and the worktop template date marked as fixed points. Those two dates, more than any other, determine when you get your kitchen back.

Contact Us →

The Kitchen Renovation Stages From Design to Handover

A well-run project moves through the same stages in roughly this order:

Tradesperson measuring a kitchen wall during a renovation as the homeowner observes the progress
Tradesperson measuring a kitchen wall during a renovation as the homeowner observes the progress
  1. Survey. A site visit to measure, check walls and floors, and identify remedial work and any services that need moving.
  2. Design and specification. Agreeing the layout, units, worktops, appliances and finishes, then signing off a written scope.
  3. Quote and order. Receiving a fixed-price quote, then placing orders for long-lead items.
  4. Preparation and remedial work. Stripping out the old kitchen, structural repairs and any plastering or damp treatment.
  5. Services. Plumbing, electrical and gas work, with certificates where required.
  6. Installation. Fitting cabinets, worktops, appliances and fixtures.
  7. Finishing and snagging. Tiling, lighting, sealing, and a final check of doors, levels and fittings.
  8. Handover. Walking through the finished kitchen and any guarantees or maintenance notes.

A single contact who coordinates these stages saves you from chasing separate trades, which is where many projects lose time. Our guide on managing multiple trades during renovations shows how to keep each phase on schedule. If you are deciding who should lead the work, read our guide to hiring kitchen fitters in Bromsgrove.

Planning Checklist: Decisions to Make Before Work Starts

Settling these decisions early prevents costly changes once fitting has begun:

Watch out: a kitchen bought online often arrives with a different tolerance or fixing system than the installer expects. Check the units against your survey before purchase, not after delivery.

Permits, Building Regulations and Where Delays Come From

Whether building regulations approval is needed depends on the work involved, and some electrical and gas work has its own requirements. Check the current requirements with your local authority building control team before you commit to a layout change, since the rules and fees can vary by area.

Inspection timing is a frequent cause of delay. If a structural element needs signing off before it is covered up, the fitting programme can stop until an inspector visits. Build a short buffer into your timeline for this.

Contingency Planning and Avoiding Budget Overruns

Hidden problems are most often discovered once old plaster, floorboards or units come out. Rotten joists, damp walls, outdated wiring and uneven subfloors are common examples, and each adds cost and time.

Keep these habits to limit overruns:

A common mistake is treating the first quote as the final cost. Ask the installer to identify what is excluded, such as making good, decorating or appliance connection, so you can budget for it.

Book a Survey Before You Set Your Budget

Every reliable quote starts with someone measuring your actual kitchen and checking its condition. You can book a kitchen fitting service in Bromsgrove covering complete renovations, remedial work and installation of customer-supplied units. A B Carpentry & Renovations offers kitchen fitting in Bromsgrove and the surrounding area, covering complete renovations, remedial work and the installation of customer-supplied units. A survey lets us confirm your scope, flag any structural or service issues early, and provide a written quote.

Frequently Asked Questions

How much does a kitchen renovation cost?

Costs vary widely with the size of the room, the level of finish, and whether structural or plumbing work is needed. A B Carpentry & Renovations does not publish fixed prices in this guide because pricing depends on the scope, materials and dates of the work. Ask for a survey and written quote based on your own layout. Budget for contingency on top of the quoted figure, since older properties often reveal problems once walls and floors are opened up.

How long does a kitchen renovation take?

The on-site work for a standard kitchen replacement usually runs for several weeks, but the full timeline is longer once design, ordering and lead times for worktops and appliances are included. Custom joinery and remedial structural work add time. Planning the order of work, from preparation and first fix through to second fix and finishing, keeps the schedule predictable and reduces the number of return visits by trades.

What is the order of work in a kitchen renovation?

Most projects follow a sequence: strip out, preparation and any structural or remedial work, first fix plumbing and electrics, plastering and making good, then installing units, worktops, appliances and finishing. Doing these stages out of order usually means paying to redo work. Agree the sequence with your builder before starting so that each trade knows when their part begins.

What can delay a kitchen renovation?

Common causes include late-arriving materials, discovering hidden defects in walls, floors or joists, and waiting for trades to become available. Building control inspections can also add time if they are needed. Confirming delivery dates before work starts and keeping a contingency in the programme helps limit the effect of these delays on the rest of the project.

Can I use my kitchen during a renovation?

In most cases you will not have a working kitchen for the main period of the work, because the room is stripped back for plumbing, electrics and new units. Many homeowners set up a temporary kitchen in another room with a microwave, kettle and fridge. Discuss the expected disruption and any dust or access arrangements with your contractor during the planning stage.

How much should I budget for unexpected kitchen renovation costs?

Holding a contingency allowance is a sensible starting point, with a higher allowance for older or character properties where hidden problems are more likely. Ask your contractor how they identify and price unforeseen work, and whether they agree changes in writing before carrying them out. A survey before the quote reduces the chance of large surprises.

What should a kitchen renovation timeline include?

A useful timeline lists each phase with its start and finish, the lead times for ordered items, the trades needed and the points where inspections or decisions are required. It should also show which tasks depend on others, so you can see the critical path. A B Carpentry & Renovations can provide a phased schedule once the scope of your project is confirmed.

Can A B Carpentry & Renovations fit kitchen units I have already bought?

Yes, the business can fit customer-supplied kitchens as part of a wider installation. Check the units are complete and undamaged before delivery, and raise any missing parts early, since they can hold up the programme. Contact A B Carpentry & Renovations to confirm the fitting arrangements for your specific units before you order anything else.